Self-Adhesive Bituminous Waterproof Membrane, its basement is made from SBS elastomer compound, good road bitumen and adhesion-promoting resins, its upper side is faced with PET Film, PE Film, aluminium foil or silicone-coated film, its bottom side is removable silicone-coated film.
Base on there if have reinforced mat, it could be divided into Non-Mat (N Type) and polyester mat ( PY Type)
|
N Type (without reinforcement) |
PY Type (with reinforcement) |
Upper surface material |
Polyethylene Membrane (PE), Polyester Film (PET) |
Polyethylene Membrane (PE), Fine Sand (S) |
Thickness(mm) |
1.2mm, 1.5mm, 2.0mm |
2.0mm, 3.0mm, 4.0mm |
Width( m) |
1m , 2m |
1m , 2m |
Specification for Self-Adhesive Bituminous Membrane: |
No. |
Items |
|
N |
PY |
1 |
Solubale Substance g/m² |
2.0mm |
≥1300 |
- |
3.0mm |
≥2100 |
4.0mm |
≥2100 |
2 |
Tensile Property |
Tension N/50mm |
2.0mm |
≥350 |
- |
3.0mm |
≥450 |
≥600 |
4.0mm |
≥450 |
≥800 |
Elongation / Max. Tension |
≥30% |
40% |
3 |
Heat Resistance(70ºC) |
No slipping, flowing or dripping |
4 |
Low Temperature Flexibility |
-20ºC |
-30ºC |
5 |
Impermeability |
0.3Mpa, 120 minutes |
6 |
Peel Strength |
Membranes(N/mm) |
≥1.0 |
Aluminum sheet(N/mm) |
≥1.5 |
7 |
Nail Water Tightness |
Pass |
|
8 |
Oil permeability (pieces) |
≤2 |
|
9 |
Holding Power |
≥15 Minutes |
10 |
Heat Aging |
Elongation/ Max. Tension |
≥30% |
≥40% |
Low Temperation Flexibility |
-18ºC |
-28ºC |
Peel Strength Aluminium sheet(N/mm) |
≥1.5 |
Dimensional Stability |
≤1.5% |
≤1.0% |
11 |
Self-adhesive Nituminous Peel strength(N/mm) |
≥1.5 |
Features:
High strength waterproof layer and strong water pressure resistance.
High tensile strength,high elongation,good adaptablility to shrinkage deformation and cracking of the substratum.
Good perfomance of breaking resistance, tearing resistance, fatigue resistance, corrosion resistance, mould resistance and weather resistance.
Good temperature resistance: can work under -20ºC, suitable for cold and hot regions, especially for cold area.
Good workability:can be applied by torch-applied method in any season and hot-joint makes the work reliable and durable.
Applycation:
Roofs or undergrounds;
Pools, such as swimming pools, fire pools;
Subways, tunnels, concrete road or bridge surfaces;
Hot-melted construction:
Base treatment → Construction of additional layer →Sheets paste construction by hot melting → Exhausting and compaction → Water permeability experiment → Construction of the protection layer
Storage & Transport:
It should be transported or stored respectively and marked clearly.
No exposed to the weather, keep ventilated.
Temperature of storage should be below 50ºC.
More than two-layer sheets are not allowed for stacking vertically during the process of transportation, while only monolayer is allowed during the storage vertically.
Sometimes a tarpaulin is essential for a rainy day or sun-shade.
Avoid the sheet to be banked or pressed laterally during the transportation process.
Under normal circumstances, the quality guarantee period is 1 year.
Certificates:
FAQ:
Q1:How to get the sample?
A :We can provide you free samples for quality inspection.
Q2:What's are the MOQ?
A :The MOQ is 500 square meters usually.Also we can according to your condition to set the MOQ.
Q3:How about the delivery time?
A :Delivery time about 7days after your deposit or L/C at sight.
Q4:Can we visit your factory to inspect the goods for the order?
A :Welcome to visit our factory to inspect the quality.We sincerely hope to establish a honest business relationship.